Building plans drawn in Pre-DCR format can be uploaded from the Corporation website with the help of a username and password which is given to all licensed architects, engineers from the Corporation. For this registration valid license certificate and ID proof necessary. A registration in any BPAMS enabled Corporations in the state will suffice. The drawing shall be verified in a priority basis manner after which hard copy documents have to be submitted at the Corporation for further verification. Any discrepancy found later can lead to resubmission of the drawing.

After the documents and drawings are verified by the concerned persons, the application fee is to be paid. These are then handed over to respective Building Inspector for site inspection. The site inspection report will be then entered into the system after which the file is then transferred to the next higher authority. The permit certificate is given after this level of verification. File movement can be tracked by the applicant using their application number

Once the applicant has submitted the application, he/she should be intimate the correspondance within 30 working days from the form submission.

Online applications shall be mandatory in the Central & Pachalam, Edapally and Vytilla zones for buildings with an area above 60 Sq.meter.

List of Hard Copy Documents to be submitted

  1. Reference Receipt received online

  2. Application form

  3. Latest Tax Receipt

  4. Ownership document/ Title deed

  5. Site plan – 3 copies

  6. Service plan – 3 copies

  7. Building plans – 3 copies

  8. Undertaking form architect/ engineer

  9. PDF drawing generated after drawing verification – 1 copy

DCR Cell Timing

Central & Pachalam

Edapally

Vytilla

Documents Submission

10.30 am to 3.00 pm
(on all working days)

10.30 am to 1.00 pm
(on all working days)

10.30 am to 1.00 pm
(on all working days)

Doubts and Status of File

2.00 pm to 4.00 pm
(on all working days)

NA

NA

Login ID & Password

10.30 am to 3.00 pm
(on all working days)

NA

NA

Pre-DCR Training

10.30 am to 4.30 pm
(on all working days)

NA

NA